Skip to content

Bal Harbour, Miami-Dade County

Demolition in Bal Harbour

Bal Harbour Village occupies the north tip of the Miami Beach barrier island, with Haulover Inlet on its northern edge. Beach erosion in 1959 led to renourishment starting in 1971, and oceanfront condominium towers line its shore. In 2020, more than half of its 3,507 housing units were vacant.

The village incorporated in 1946, and Bal Harbour Shops, opened in 1965, stands on the site of a World War II prisoner-of-war camp. Interior demolition in a tower or a shop happens with occupied space on the other side of the wall, so dust, noise and debris routes are planned first.

The village fee schedule sets a separate fine for demolishing without a permit, so nothing comes out before the permit is issued. That includes interior strip-outs, where the county asbestos survey rule for renovation over 160 square feet also applies.

The Dade County Coastal Construction Control Line runs along the Atlantic shore from the Broward line south to Biscayne Bay, and DEP permits work that alters, excavates or constructs seaward of it. Sea turtle nesting season in Miami-Dade runs April 1 to October 31, and beach-side work is planned around it.

Sources: Wikipedia: Bal Harbour, Florida · Bal Harbour Village fee schedule FY 2024 · Miami-Dade County: building permits and demolition requirements · Rule 62B-26.012, Dade County CCCL · Sea turtle nesting season in Miami-Dade

Who issues the permit in Bal Harbour

Bal Harbour Village Building Department

The village fee schedule sets a separate fine for demolition without a permit.

See the official page

This is general information, not legal advice. If you hire Romco, we apply for the permit as contractor of record. Miami-Dade demolition permit guide

What we quote in Bal Harbour

Other work we quote

From first call to final

The order a Miami-Dade job follows

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and a mid-rise run through the same steps.

  1. Call or send the request

    Give us the address, photos or plans if you have them, and a plain account of what goes and what remains.

  2. Site visit

    We check how the building is framed, where the services enter, how trucks and machines get in, and what stands on either side.

  3. Scope and quote in writing

    You get a written scope listing removals, protections and haul-off, with any item that hangs on the asbestos survey called out.

  4. Survey, notice and permit

    A licensed asbestos survey, the DERM notice where it applies, the utility disconnects, then the permit from the city or the county.

  5. Take-down and hauling

    Work runs in the agreed sequence. Loads go to permitted facilities, and we keep the tickets.

  6. Final and closeout

    The inspector signs off the permit. You are left with a clean lot, or the shell you asked us to keep.

Questions

Demolition in Bal Harbour

What happens in Bal Harbour if demolition starts before the permit is issued?

The village fee schedule carries a separate fine for demolishing without a permit. We do not start any removal, including interior strip-outs, until the permit is issued. Confirm the current schedule with the Building Department.

How much will my demolition cost?

We quote each job after seeing it, in person or through photos and plans when they show enough. The figure moves with the construction type, the floor area and height, the asbestos survey result, the utilities to be cut off, how machines reach the work, what stands next door, what must be kept, and how far the loads travel. A 1950s concrete block house and a 1990s frame addition can sit on the same street and quote very differently, which is why we publish no rates.

Why does Miami-Dade want an asbestos survey even for a house?

The county's own demolition requirements call for an asbestos survey on every demolition project, which is stricter than the federal rule for some small homes. A notice of demolition also goes to DERM, the county's environmental resources office, no later than ten working days ahead of the start date. The building permit is a different document and cannot stand in for it. We arrange a licensed survey, and a licensed abatement firm removes anything the work would disturb. Romco coordinates both and is not an abatement contractor.

How long does it take to get from first call to a cleared site?

We will not guess before the facts are known. The answer depends on the plan review queue at your city or the county, how fast the utilities issue their disconnect letters, what the survey turns up and the notice period that follows, any historic or condo board approval, and how big the building is and what it is built from. When we know those, you get a sequence that names what each step waits on.

Other Miami-Dade cities: Miami · Miami Beach · Hialeah · Coral Gables · Doral · Homestead · Miami Gardens · North Miami · North Miami Beach · Aventura · Sunny Isles Beach · Surfside · Key Biscayne · Pinecrest · Palmetto Bay · Cutler Bay · South Miami · Miami Lakes · Miami Springs · Florida City · Sweetwater · Kendall

Every type, every size, all of Miami-Dade

Tell us what is coming down. We will put a quote on it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single interior partition or a complete building gets the same thing: a written scope and a quote.

Call (305) 760-9827Request a quote