Miami Lakes, Miami-Dade County

Demolition in Miami Lakes

Miami Lakes is a planned town of curving lakes that the Graham family's Sengra company began building in 1962, and it incorporated in December 2000. The Building Department lets owner-builders demolish only one- and two-family homes, requires every utility disconnected before work, and takes applications through eTRAKiT.

Where a lot backs onto one of the town's lakes, the ground is the county's shallow limestone with a water table close to the surface. Demolition next to the water is planned so debris and runoff stay out of the lake, and dewatering is scoped wherever foundations or pools come out.

Utilities come first here. Power, water, sewer and gas are disconnected or capped by the providers and licensed trades before demolition begins, and we coordinate each one.

The town has its own tree removal permit application, so any tree that needs to go with the building is permitted through Miami Lakes before work starts.

Sources: Wikipedia: Miami Lakes, Florida · Town of Miami Lakes: tree removal permit application · USGS: Biscayne aquifer

Who issues the permit in Miami Lakes

Town of Miami Lakes Building Department

Apply through eTRAKiT. Owner-builders may demolish only one- and two-family homes, and all utilities must be disconnected first.

See the official page

This is general information, not legal advice. If you hire Romco, we apply for the permit as contractor of record. Miami-Dade demolition permit guide

What we quote in Miami Lakes

Other work we quote

From first call to final

The order a Miami-Dade job follows

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and a mid-rise run through the same steps.

  1. Call or send the request

    Give us the address, photos or plans if you have them, and a plain account of what goes and what remains.

  2. Site visit

    We check how the building is framed, where the services enter, how trucks and machines get in, and what stands on either side.

  3. Scope and quote in writing

    You get a written scope listing removals, protections and haul-off, with any item that hangs on the asbestos survey called out.

  4. Survey, notice and permit

    A licensed asbestos survey, the DERM notice where it applies, the utility disconnects, then the permit from the city or the county.

  5. Take-down and hauling

    Work runs in the agreed sequence. Loads go to permitted facilities, and we keep the tickets.

  6. Final and closeout

    The inspector signs off the permit. You are left with a clean lot, or the shell you asked us to keep.

Questions

Demolition in Miami Lakes

Which utilities must be disconnected before a Miami Lakes demolition?

The Building Department says all utilities must be disconnected first. In practice that means power, water, sewer and gas, each handled by the provider or a licensed trade, which we coordinate. Confirm the current requirement with the Building Department.

How much will my demolition cost?

We quote each job after seeing it, in person or through photos and plans when they show enough. The figure moves with the construction type, the floor area and height, the asbestos survey result, the utilities to be cut off, how machines reach the work, what stands next door, what must be kept, and how far the loads travel. A 1950s concrete block house and a 1990s frame addition can sit on the same street and quote very differently, which is why we publish no rates.

Why does Miami-Dade want an asbestos survey even for a house?

The county's own demolition requirements call for an asbestos survey on every demolition project, which is stricter than the federal rule for some small homes. A notice of demolition also goes to DERM, the county's environmental resources office, no later than ten working days ahead of the start date. The building permit is a different document and cannot stand in for it. We arrange a licensed survey, and a licensed abatement firm removes anything the work would disturb. Romco coordinates both and is not an abatement contractor.

How long does it take to get from first call to a cleared site?

We will not guess before the facts are known. The answer depends on the plan review queue at your city or the county, how fast the utilities issue their disconnect letters, what the survey turns up and the notice period that follows, any historic or condo board approval, and how big the building is and what it is built from. When we know those, you get a sequence that names what each step waits on.

Other Miami-Dade cities: Miami · Miami Beach · Hialeah · Coral Gables · Doral · Homestead · Miami Gardens · North Miami · North Miami Beach · Aventura · Sunny Isles Beach · Surfside · Bal Harbour · Key Biscayne · Pinecrest · Palmetto Bay · Cutler Bay · South Miami · Miami Springs · Florida City · Sweetwater · Kendall

Every type, every size, all of Miami-Dade

Tell us what is coming down. We will put a quote on it.