Coral Gables, Miami-Dade County
Demolition in Coral Gables
Coral Gables puts every demolition permit for a non-designated building in front of the Historic Preservation Officer, who issues a Historical Significance Determination Letter. Any citizen may appeal within 10 days of the online posting, and the approval lasts 18 months. In George Merrick's planned city, that letter is the first step of the job.
Merrick's original plan required Mediterranean Revival, and the style remains nearly universal across the city. Census ACS data puts the median build year of Coral Gables housing at 1969, with roughly six in ten homes built before 1980. That age makes a licensed asbestos survey routine, and we arrange one before the demolition quote is fixed.
If the Historic Preservation Officer finds a building eligible for designation, it goes to the Historic Preservation Board for a designation hearing, which recent letters schedule within 90 days. Demolishing a designated building requires a Special Certificate of Appropriateness. That means notice mailed within a 1,000-foot radius, a Board of Architects recommendation first, and the applicant present at the hearing.
We plan the schedule around that review, not against it. The determination letter, the appeal window and the approval's 18-month life all decide when equipment can mobilize, so we confirm each with the city before committing crews.
Sources: Coral Gables Ordinance 2023-03, Historic Significance Determination Letters · Coral Gables determination letter (eligibility and 90-day hearing) · Coral Gables Certificate of Appropriateness application · Coral Gables determination letter citing Sec. 8-107(G) · Wikipedia: Coral Gables, Florida · Census Reporter, median year structure built (ACS 2020-2024)
Who issues the permit in Coral Gables
City of Coral Gables Development Services, with Historical Resources and Cultural Arts
Under Zoning Code Sec. 8-107(G), demolition of a non-designated building needs Historic Preservation Officer approval. Designated buildings need a Special Certificate of Appropriateness.
See the official pageThis is general information, not legal advice. If you hire Romco, we apply for the permit as contractor of record. Miami-Dade demolition permit guide
What we quote in Coral Gables
Other work we quote
- Interior demolitionCondo units, offices and retail space taken back to the shell, in the right order.Interior demolition in Miami-Dade →
- Selective demolitionRemove one part of a building and keep the rest standing and in service.Selective demolition in Miami-Dade →
- Commercial demolitionWhole commercial buildings down to grade, with DERM and the permit file in order.Commercial demolition in Miami-Dade →
- House demolitionA full teardown of a single-family home, from permit to a graded lot.House demolition in Miami-Dade →
- Structural demolitionUnsafe or failed structures taken down under an engineer's plan and the county's order.Structural demolition in Miami-Dade →
- Concrete removalSlabs, driveways, footings and hardscape broken out, hauled and graded.Concrete removal in Miami-Dade →
- Pool removalIn-ground pools filled in or removed, with groundwater and backfill planned.Pool removal in Miami-Dade →
- Mobile home demolitionManufactured and mobile homes taken down and hauled, additions and pads included.Mobile home demolition in Miami-Dade →
- Storm damage demolitionHurricane- and flood-damaged structures taken down or opened up for repair.Storm damage demolition in Miami-Dade →
- Site clearingLots cleared of structures, slabs, debris and brush, with tree permits in order.Site clearing in Miami-Dade →
- Asbestos coordinationLicensed asbestos survey, abatement and the DERM notice, arranged in order.Asbestos coordination in Miami-Dade →
- Accessory structure demolitionDetached garages, sheds, carports, screen rooms and guest houses removed.Accessory structure demolition in Miami-Dade →
- Something else?Your job is not listed? We still quote it. Call and walk us through it.Call (305) 760-9827 →
From first call to final
The order a Miami-Dade job follows
Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and a mid-rise run through the same steps.
Call or send the request
Give us the address, photos or plans if you have them, and a plain account of what goes and what remains.
Site visit
We check how the building is framed, where the services enter, how trucks and machines get in, and what stands on either side.
Scope and quote in writing
You get a written scope listing removals, protections and haul-off, with any item that hangs on the asbestos survey called out.
Survey, notice and permit
A licensed asbestos survey, the DERM notice where it applies, the utility disconnects, then the permit from the city or the county.
Take-down and hauling
Work runs in the agreed sequence. Loads go to permitted facilities, and we keep the tickets.
Final and closeout
The inspector signs off the permit. You are left with a clean lot, or the shell you asked us to keep.
Questions
Demolition in Coral Gables
What happens if Coral Gables finds my building eligible for historic designation?
The request goes to the Historic Preservation Board for a designation hearing, which recent city letters set within 90 days. If the building is designated, demolition then needs a Special Certificate of Appropriateness, with a Board of Architects recommendation first. Confirm the current steps with the city's Historical Resources office.
How much will my demolition cost?
We quote each job after seeing it, in person or through photos and plans when they show enough. The figure moves with the construction type, the floor area and height, the asbestos survey result, the utilities to be cut off, how machines reach the work, what stands next door, what must be kept, and how far the loads travel. A 1950s concrete block house and a 1990s frame addition can sit on the same street and quote very differently, which is why we publish no rates.
Why does Miami-Dade want an asbestos survey even for a house?
The county's own demolition requirements call for an asbestos survey on every demolition project, which is stricter than the federal rule for some small homes. A notice of demolition also goes to DERM, the county's environmental resources office, no later than ten working days ahead of the start date. The building permit is a different document and cannot stand in for it. We arrange a licensed survey, and a licensed abatement firm removes anything the work would disturb. Romco coordinates both and is not an abatement contractor.
How long does it take to get from first call to a cleared site?
We will not guess before the facts are known. The answer depends on the plan review queue at your city or the county, how fast the utilities issue their disconnect letters, what the survey turns up and the notice period that follows, any historic or condo board approval, and how big the building is and what it is built from. When we know those, you get a sequence that names what each step waits on.
Other Miami-Dade cities: Miami · Miami Beach · Hialeah · Doral · Homestead · Miami Gardens · North Miami · North Miami Beach · Aventura · Sunny Isles Beach · Surfside · Bal Harbour · Key Biscayne · Pinecrest · Palmetto Bay · Cutler Bay · South Miami · Miami Lakes · Miami Springs · Florida City · Sweetwater · Kendall
Every type, every size, all of Miami-Dade
Tell us what is coming down. We will put a quote on it.
Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single interior partition or a complete building gets the same thing: a written scope and a quote.