Census figures give Homestead housing a median build year of 2001, decades newer than Miami Beach or Hialeah, because Hurricane Andrew struck the city and Homestead Air Force Base on August 24, 1992. Demolition permits here move through the EPL-B.U.I.L.D. platform, with zoning reviewed first and the Building Official last.

Incorporated in 1913, Homestead is the second-oldest city in the county, set in a major agricultural area. It borders Homestead Air Reserve Base along SW 137th Avenue. Andrew destroyed nearly all of the city's 1,176 mobile homes, according to the National Weather Service, and only about one in five homes here predates 1980.

The city reviews a permit in order: zoning, building, electrical, mechanical, plumbing, structural, then the Building Official. The County asbestos notice is on the list, and the city asks for a temporary fence and dust screen permit. Newer construction lowers the asbestos question but does not remove it, since the county requires a survey for all demolition projects.

Andrew drove the creation of the statewide Florida Building Code, which took effect in 2002. A rebuild on a cleared Homestead lot must use products carrying a Miami-Dade Notice of Acceptance, so the demolition scope and the new design should be read together.

Sources: Census Reporter, median year structure built (ACS 2020-2024) · Wikipedia: Homestead, Florida · National Weather Service: Hurricane Andrew · City of Homestead demolition requirements · City of Homestead checklist (fence and dust screen) · Miami-Dade County: building permits and demolition requirements · Florida Building Code and product approvals history · Miami-Dade Product Control Notice of Acceptance (example)

Who issues the permit in Homestead

City of Homestead Building Division

Apply through EPL-B.U.I.L.D. Review runs zoning, building, trades, structural, then the Building Official, and the County asbestos notice is required.

See the official page

This is general information, not legal advice. If you hire Romco, we apply for the permit as contractor of record. Miami-Dade demolition permit guide

What we quote in Homestead

Other work we quote

From first call to final

The order a Miami-Dade job follows

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and a mid-rise run through the same steps.

  1. Call or send the request

    Give us the address, photos or plans if you have them, and a plain account of what goes and what remains.

  2. Site visit

    We check how the building is framed, where the services enter, how trucks and machines get in, and what stands on either side.

  3. Scope and quote in writing

    You get a written scope listing removals, protections and haul-off, with any item that hangs on the asbestos survey called out.

  4. Survey, notice and permit

    A licensed asbestos survey, the DERM notice where it applies, the utility disconnects, then the permit from the city or the county.

  5. Take-down and hauling

    Work runs in the agreed sequence. Loads go to permitted facilities, and we keep the tickets.

  6. Final and closeout

    The inspector signs off the permit. You are left with a clean lot, or the shell you asked us to keep.

Questions

Demolition in Homestead

Does a post-Andrew house in Homestead still need an asbestos survey before demolition?

Yes. The county requires an asbestos survey for all demolition projects whatever the building's age, and Homestead's list includes the County asbestos notice. We arrange the survey through an independent licensed consultant.

How much will my demolition cost?

We quote each job after seeing it, in person or through photos and plans when they show enough. The figure moves with the construction type, the floor area and height, the asbestos survey result, the utilities to be cut off, how machines reach the work, what stands next door, what must be kept, and how far the loads travel. A 1950s concrete block house and a 1990s frame addition can sit on the same street and quote very differently, which is why we publish no rates.

Why does Miami-Dade want an asbestos survey even for a house?

The county's own demolition requirements call for an asbestos survey on every demolition project, which is stricter than the federal rule for some small homes. A notice of demolition also goes to DERM, the county's environmental resources office, no later than ten working days ahead of the start date. The building permit is a different document and cannot stand in for it. We arrange a licensed survey, and a licensed abatement firm removes anything the work would disturb. Romco coordinates both and is not an abatement contractor.

How long does it take to get from first call to a cleared site?

We will not guess before the facts are known. The answer depends on the plan review queue at your city or the county, how fast the utilities issue their disconnect letters, what the survey turns up and the notice period that follows, any historic or condo board approval, and how big the building is and what it is built from. When we know those, you get a sequence that names what each step waits on.

Other Miami-Dade cities: Miami · Miami Beach · Hialeah · Coral Gables · Doral · Miami Gardens · North Miami · North Miami Beach · Aventura · Sunny Isles Beach · Surfside · Bal Harbour · Key Biscayne · Pinecrest · Palmetto Bay · Cutler Bay · South Miami · Miami Lakes · Miami Springs · Florida City · Sweetwater · Kendall

Every type, every size, all of Miami-Dade

Tell us what is coming down. We will put a quote on it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single interior partition or a complete building gets the same thing: a written scope and a quote.

Call (305) 760-9827Request a quote