Skip to content

Miami Gardens, Miami-Dade County

Demolition in Miami Gardens

Miami Gardens, home of Hard Rock Stadium, incorporated in 2003 around neighborhoods such as Carol City, Norland and Norwood that grew after I-95 opened in the late 1960s. Its demolition checklist asks for DERM approval, a state Health Department permit to abandon a septic tank, and erosion and sediment controls.

The city has the highest share of African American residents of any Florida city, and much of its growth came with a late-1960s migration of Black and West Indian families after I-95 opened.

On utilities, the checklist asks for a WASD meter disconnect letter and a letter from TECO or Florida City Gas, along with DERM approval for the demolition itself. We coordinate each disconnect with the provider before the permit package goes in.

Erosion and sediment controls are on the list, so measures such as silt fencing go in before demolition and stay until the lot is stable. Where a lot still runs on septic, the tank is abandoned under a state Health Department permit by a licensed contractor we coordinate. Confirm the current checklist with Development Services.

Sources: Wikipedia: Miami Gardens, Florida · City of Miami Gardens: documents and forms

Who issues the permit in Miami Gardens

City of Miami Gardens Development Services, Building

Checklist items include DERM approval, a state Health Department septic abandonment permit, erosion and sediment controls, and utility disconnect letters.

See the official page

This is general information, not legal advice. If you hire Romco, we apply for the permit as contractor of record. Miami-Dade demolition permit guide

What we quote in Miami Gardens

Other work we quote

From first call to final

The order a Miami-Dade job follows

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and a mid-rise run through the same steps.

  1. Call or send the request

    Give us the address, photos or plans if you have them, and a plain account of what goes and what remains.

  2. Site visit

    We check how the building is framed, where the services enter, how trucks and machines get in, and what stands on either side.

  3. Scope and quote in writing

    You get a written scope listing removals, protections and haul-off, with any item that hangs on the asbestos survey called out.

  4. Survey, notice and permit

    A licensed asbestos survey, the DERM notice where it applies, the utility disconnects, then the permit from the city or the county.

  5. Take-down and hauling

    Work runs in the agreed sequence. Loads go to permitted facilities, and we keep the tickets.

  6. Final and closeout

    The inspector signs off the permit. You are left with a clean lot, or the shell you asked us to keep.

Questions

Demolition in Miami Gardens

Who handles the septic tank when a Miami Gardens house is demolished?

The city's checklist requires a state Health Department permit to abandon a septic tank. That work is done by a licensed contractor under the permit, and we coordinate it with the demolition. Confirm the current requirement with Development Services.

How much will my demolition cost?

We quote each job after seeing it, in person or through photos and plans when they show enough. The figure moves with the construction type, the floor area and height, the asbestos survey result, the utilities to be cut off, how machines reach the work, what stands next door, what must be kept, and how far the loads travel. A 1950s concrete block house and a 1990s frame addition can sit on the same street and quote very differently, which is why we publish no rates.

Why does Miami-Dade want an asbestos survey even for a house?

The county's own demolition requirements call for an asbestos survey on every demolition project, which is stricter than the federal rule for some small homes. A notice of demolition also goes to DERM, the county's environmental resources office, no later than ten working days ahead of the start date. The building permit is a different document and cannot stand in for it. We arrange a licensed survey, and a licensed abatement firm removes anything the work would disturb. Romco coordinates both and is not an abatement contractor.

How long does it take to get from first call to a cleared site?

We will not guess before the facts are known. The answer depends on the plan review queue at your city or the county, how fast the utilities issue their disconnect letters, what the survey turns up and the notice period that follows, any historic or condo board approval, and how big the building is and what it is built from. When we know those, you get a sequence that names what each step waits on.

Other Miami-Dade cities: Miami · Miami Beach · Hialeah · Coral Gables · Doral · Homestead · North Miami · North Miami Beach · Aventura · Sunny Isles Beach · Surfside · Bal Harbour · Key Biscayne · Pinecrest · Palmetto Bay · Cutler Bay · South Miami · Miami Lakes · Miami Springs · Florida City · Sweetwater · Kendall

Every type, every size, all of Miami-Dade

Tell us what is coming down. We will put a quote on it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single interior partition or a complete building gets the same thing: a written scope and a quote.

Call (305) 760-9827Request a quote