South Miami, Miami-Dade County

Demolition in South Miami

South Miami, incorporated in 1927, holds the Cambridge Lawns Historic District: about 30 Tudor and Mediterranean Revival homes from 1928, recognized in 2005. The city's Building Division asks for color photos of the right-of-way and a tree location plan with every demolition permit application.

Houses of that age raise the asbestos question early, and we arrange a licensed survey before the scope is quoted. The tree location plan also matters on established streets, where canopy over the lot and the swale limits where equipment can stand.

The city has a historic preservation ordinance, and board decisions can be appealed within 15 days. If the property is in or near a historic district, ask the city how the ordinance applies before you file for demolition.

Right-of-way photos record the sidewalk, curb and swale before any truck arrives. We take them as the city specifies and keep them with the job file.

Sources: Wikipedia: South Miami, Florida · City of South Miami Building Division · City of South Miami historic preservation ordinance

Who issues the permit in South Miami

City of South Miami Building Division

Demolition permits need color photos of the right-of-way and a tree location plan. Confirm the current documents list with the Building Division.

See the official page

This is general information, not legal advice. If you hire Romco, we apply for the permit as contractor of record. Miami-Dade demolition permit guide

What we quote in South Miami

Other work we quote

From first call to final

The order a Miami-Dade job follows

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and a mid-rise run through the same steps.

  1. Call or send the request

    Give us the address, photos or plans if you have them, and a plain account of what goes and what remains.

  2. Site visit

    We check how the building is framed, where the services enter, how trucks and machines get in, and what stands on either side.

  3. Scope and quote in writing

    You get a written scope listing removals, protections and haul-off, with any item that hangs on the asbestos survey called out.

  4. Survey, notice and permit

    A licensed asbestos survey, the DERM notice where it applies, the utility disconnects, then the permit from the city or the county.

  5. Take-down and hauling

    Work runs in the agreed sequence. Loads go to permitted facilities, and we keep the tickets.

  6. Final and closeout

    The inspector signs off the permit. You are left with a clean lot, or the shell you asked us to keep.

Questions

Demolition in South Miami

Why does South Miami ask for photos of the right-of-way with a demolition permit?

The city lists color photos of the right-of-way among the documents needed. They show the condition of the sidewalk, curb and swale before work starts, which gives the owner and the city a shared record. Confirm what the photos must show with the Building Division.

How much will my demolition cost?

We quote each job after seeing it, in person or through photos and plans when they show enough. The figure moves with the construction type, the floor area and height, the asbestos survey result, the utilities to be cut off, how machines reach the work, what stands next door, what must be kept, and how far the loads travel. A 1950s concrete block house and a 1990s frame addition can sit on the same street and quote very differently, which is why we publish no rates.

Why does Miami-Dade want an asbestos survey even for a house?

The county's own demolition requirements call for an asbestos survey on every demolition project, which is stricter than the federal rule for some small homes. A notice of demolition also goes to DERM, the county's environmental resources office, no later than ten working days ahead of the start date. The building permit is a different document and cannot stand in for it. We arrange a licensed survey, and a licensed abatement firm removes anything the work would disturb. Romco coordinates both and is not an abatement contractor.

How long does it take to get from first call to a cleared site?

We will not guess before the facts are known. The answer depends on the plan review queue at your city or the county, how fast the utilities issue their disconnect letters, what the survey turns up and the notice period that follows, any historic or condo board approval, and how big the building is and what it is built from. When we know those, you get a sequence that names what each step waits on.

Other Miami-Dade cities: Miami · Miami Beach · Hialeah · Coral Gables · Doral · Homestead · Miami Gardens · North Miami · North Miami Beach · Aventura · Sunny Isles Beach · Surfside · Bal Harbour · Key Biscayne · Pinecrest · Palmetto Bay · Cutler Bay · Miami Lakes · Miami Springs · Florida City · Sweetwater · Kendall

Every type, every size, all of Miami-Dade

Tell us what is coming down. We will put a quote on it.