North Miami, Miami-Dade County

Demolition in North Miami

North Miami's population jumped from 1,973 in 1940 to 10,734 in 1950, and much of its housing comes from that post-war boom. The city faces Biscayne Bay, with Oleta River State Park at its northeast end, and commercial demolition here goes to DERM before the city reviews it.

Incorporated in 1926 as Arch Creek and renamed North Miami in 1931, the city is home to MOCA and the FIU Biscayne Bay Campus. Oleta River State Park, the largest urban park in the state, sits at its northeast end. Houses from that boom are now more than 70 years old, and their age makes a licensed asbestos survey a first step.

The city's checklist includes utility disconnect letters and an asbestos report for commercial jobs, with DERM review of commercial demolition before city review begins. We arrange the licensed survey, coordinate the licensed abatement firm, and gather the disconnect letters so the package reaches DERM complete.

Bayside lots sit on the same shallow limestone as the rest of the county, with a water table that answers quickly to rain. Removing a seawall-adjacent slab or an old pool can bring water into the cut, and Romco self-performs dewatering for that reason.

Sources: Wikipedia: North Miami, Florida · City of North Miami: forms and permits · USGS: Biscayne aquifer

Who issues the permit in North Miami

City of North Miami Building and Zoning

Checklist items include utility disconnect letters, an asbestos report for commercial jobs, and DERM review of commercial demolition before city review.

See the official page

This is general information, not legal advice. If you hire Romco, we apply for the permit as contractor of record. Miami-Dade demolition permit guide

What we quote in North Miami

Other work we quote

From first call to final

The order a Miami-Dade job follows

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and a mid-rise run through the same steps.

  1. Call or send the request

    Give us the address, photos or plans if you have them, and a plain account of what goes and what remains.

  2. Site visit

    We check how the building is framed, where the services enter, how trucks and machines get in, and what stands on either side.

  3. Scope and quote in writing

    You get a written scope listing removals, protections and haul-off, with any item that hangs on the asbestos survey called out.

  4. Survey, notice and permit

    A licensed asbestos survey, the DERM notice where it applies, the utility disconnects, then the permit from the city or the county.

  5. Take-down and hauling

    Work runs in the agreed sequence. Loads go to permitted facilities, and we keep the tickets.

  6. Final and closeout

    The inspector signs off the permit. You are left with a clean lot, or the shell you asked us to keep.

Questions

Demolition in North Miami

Does a commercial demolition in North Miami start with the city or with DERM?

With DERM. North Miami's checklist puts DERM review of commercial demolition ahead of city review, and it asks for an asbestos report on commercial jobs. Confirm the order with Building and Zoning before you set a start date.

How much will my demolition cost?

We quote each job after seeing it, in person or through photos and plans when they show enough. The figure moves with the construction type, the floor area and height, the asbestos survey result, the utilities to be cut off, how machines reach the work, what stands next door, what must be kept, and how far the loads travel. A 1950s concrete block house and a 1990s frame addition can sit on the same street and quote very differently, which is why we publish no rates.

Why does Miami-Dade want an asbestos survey even for a house?

The county's own demolition requirements call for an asbestos survey on every demolition project, which is stricter than the federal rule for some small homes. A notice of demolition also goes to DERM, the county's environmental resources office, no later than ten working days ahead of the start date. The building permit is a different document and cannot stand in for it. We arrange a licensed survey, and a licensed abatement firm removes anything the work would disturb. Romco coordinates both and is not an abatement contractor.

How long does it take to get from first call to a cleared site?

We will not guess before the facts are known. The answer depends on the plan review queue at your city or the county, how fast the utilities issue their disconnect letters, what the survey turns up and the notice period that follows, any historic or condo board approval, and how big the building is and what it is built from. When we know those, you get a sequence that names what each step waits on.

Other Miami-Dade cities: Miami · Miami Beach · Hialeah · Coral Gables · Doral · Homestead · Miami Gardens · North Miami Beach · Aventura · Sunny Isles Beach · Surfside · Bal Harbour · Key Biscayne · Pinecrest · Palmetto Bay · Cutler Bay · South Miami · Miami Lakes · Miami Springs · Florida City · Sweetwater · Kendall

Every type, every size, all of Miami-Dade

Tell us what is coming down. We will put a quote on it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single interior partition or a complete building gets the same thing: a written scope and a quote.

Call (305) 760-9827Request a quote