Miami Springs, Miami-Dade County

Demolition in Miami Springs

Glenn Curtiss and James Bright founded Miami Springs in 1926 as Country Club Estates, choosing Pueblo Revival as the town's theme, and Miami International Airport borders it to the south. The Building Department will not issue a demolition permit without a temporary fence, and designated properties need a Certificate of Appropriateness.

Curtiss-Bright built Pueblo-Mission houses here from 1924, and the Curtiss Mansion of 1925 was restored and reopened in 2012 after arson damage. Older houses in town can carry historic value, so the first check is whether the property is designated.

Designated properties go to the Historic Preservation Board for a Certificate of Appropriateness. The demolition checklist also asks for an FPL letter or electrical permit and for water and sewer to be capped, and it states that no permit is issued without a temporary fence.

We set the fence, coordinate the disconnects and the capping with the providers and licensed trades, and arrange a licensed asbestos survey before filing.

Sources: Wikipedia: Miami Springs, Florida · City of Miami Springs: historic preservation · City of Miami Springs: Do I need a Certificate of Appropriateness?

Who issues the permit in Miami Springs

City of Miami Springs Building Department

No demolition permit without a temporary fence. Utility disconnects and capping are required, and designated properties need a Certificate of Appropriateness. Confirm with the Building Department.

See the official page

This is general information, not legal advice. If you hire Romco, we apply for the permit as contractor of record. Miami-Dade demolition permit guide

What we quote in Miami Springs

Other work we quote

From first call to final

The order a Miami-Dade job follows

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and a mid-rise run through the same steps.

  1. Call or send the request

    Give us the address, photos or plans if you have them, and a plain account of what goes and what remains.

  2. Site visit

    We check how the building is framed, where the services enter, how trucks and machines get in, and what stands on either side.

  3. Scope and quote in writing

    You get a written scope listing removals, protections and haul-off, with any item that hangs on the asbestos survey called out.

  4. Survey, notice and permit

    A licensed asbestos survey, the DERM notice where it applies, the utility disconnects, then the permit from the city or the county.

  5. Take-down and hauling

    Work runs in the agreed sequence. Loads go to permitted facilities, and we keep the tickets.

  6. Final and closeout

    The inspector signs off the permit. You are left with a clean lot, or the shell you asked us to keep.

Questions

Demolition in Miami Springs

Does Miami Springs review demolition of its older Pueblo Revival houses?

If the property is designated, demolition needs a Certificate of Appropriateness from the Historic Preservation Board. Check the designation with the city before you plan the job.

How much will my demolition cost?

We quote each job after seeing it, in person or through photos and plans when they show enough. The figure moves with the construction type, the floor area and height, the asbestos survey result, the utilities to be cut off, how machines reach the work, what stands next door, what must be kept, and how far the loads travel. A 1950s concrete block house and a 1990s frame addition can sit on the same street and quote very differently, which is why we publish no rates.

Why does Miami-Dade want an asbestos survey even for a house?

The county's own demolition requirements call for an asbestos survey on every demolition project, which is stricter than the federal rule for some small homes. A notice of demolition also goes to DERM, the county's environmental resources office, no later than ten working days ahead of the start date. The building permit is a different document and cannot stand in for it. We arrange a licensed survey, and a licensed abatement firm removes anything the work would disturb. Romco coordinates both and is not an abatement contractor.

How long does it take to get from first call to a cleared site?

We will not guess before the facts are known. The answer depends on the plan review queue at your city or the county, how fast the utilities issue their disconnect letters, what the survey turns up and the notice period that follows, any historic or condo board approval, and how big the building is and what it is built from. When we know those, you get a sequence that names what each step waits on.

Other Miami-Dade cities: Miami · Miami Beach · Hialeah · Coral Gables · Doral · Homestead · Miami Gardens · North Miami · North Miami Beach · Aventura · Sunny Isles Beach · Surfside · Bal Harbour · Key Biscayne · Pinecrest · Palmetto Bay · Cutler Bay · South Miami · Miami Lakes · Florida City · Sweetwater · Kendall

Every type, every size, all of Miami-Dade

Tell us what is coming down. We will put a quote on it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single interior partition or a complete building gets the same thing: a written scope and a quote.