Sweetwater, Miami-Dade County

Demolition in Sweetwater

Sweetwater's demolition affidavit draws a hard line: no electrical, plumbing, gas or HVAC may be removed under the demolition permit, because each trade needs its own permit. The city, incorporated in 1941, roughly doubled in size through a 2021 annexation, and Dolphin Mall was annexed in 2010.

Lots in Sweetwater were sold from 1938 onward, and retired Russian circus performers with dwarfism built small-scale homes here. Florida International University's main campus lies just south of the city.

The affidavit shapes the sequence. Licensed electricians, plumbers, gas fitters and mechanical contractors pull their own permits and remove their systems first, and the demolition follows. We coordinate those trades so the permits line up instead of stalling one another.

Commercial demolition in Miami-Dade also needs DERM approval and an asbestos survey.

Sources: Wikipedia: Sweetwater, Miami-Dade County, Florida · City of Sweetwater Building and Zoning · Miami-Dade County: building permits and demolition requirements

Who issues the permit in Sweetwater

City of Sweetwater Building and Zoning

The demolition affidavit bars removing electrical, plumbing, gas or HVAC under the demolition permit; each needs its own permit.

See the official page

This is general information, not legal advice. If you hire Romco, we apply for the permit as contractor of record. Miami-Dade demolition permit guide

What we quote in Sweetwater

Other work we quote

From first call to final

The order a Miami-Dade job follows

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and a mid-rise run through the same steps.

  1. Call or send the request

    Give us the address, photos or plans if you have them, and a plain account of what goes and what remains.

  2. Site visit

    We check how the building is framed, where the services enter, how trucks and machines get in, and what stands on either side.

  3. Scope and quote in writing

    You get a written scope listing removals, protections and haul-off, with any item that hangs on the asbestos survey called out.

  4. Survey, notice and permit

    A licensed asbestos survey, the DERM notice where it applies, the utility disconnects, then the permit from the city or the county.

  5. Take-down and hauling

    Work runs in the agreed sequence. Loads go to permitted facilities, and we keep the tickets.

  6. Final and closeout

    The inspector signs off the permit. You are left with a clean lot, or the shell you asked us to keep.

Questions

Demolition in Sweetwater

Who removes the wiring and plumbing in a Sweetwater demolition?

Licensed trades under their own permits. Sweetwater's affidavit says no electrical, plumbing, gas or HVAC may be removed under the demolition permit. We coordinate those trades ahead of the demolition. Confirm the rule with Building and Zoning.

How much will my demolition cost?

We quote each job after seeing it, in person or through photos and plans when they show enough. The figure moves with the construction type, the floor area and height, the asbestos survey result, the utilities to be cut off, how machines reach the work, what stands next door, what must be kept, and how far the loads travel. A 1950s concrete block house and a 1990s frame addition can sit on the same street and quote very differently, which is why we publish no rates.

Why does Miami-Dade want an asbestos survey even for a house?

The county's own demolition requirements call for an asbestos survey on every demolition project, which is stricter than the federal rule for some small homes. A notice of demolition also goes to DERM, the county's environmental resources office, no later than ten working days ahead of the start date. The building permit is a different document and cannot stand in for it. We arrange a licensed survey, and a licensed abatement firm removes anything the work would disturb. Romco coordinates both and is not an abatement contractor.

How long does it take to get from first call to a cleared site?

We will not guess before the facts are known. The answer depends on the plan review queue at your city or the county, how fast the utilities issue their disconnect letters, what the survey turns up and the notice period that follows, any historic or condo board approval, and how big the building is and what it is built from. When we know those, you get a sequence that names what each step waits on.

Other Miami-Dade cities: Miami · Miami Beach · Hialeah · Coral Gables · Doral · Homestead · Miami Gardens · North Miami · North Miami Beach · Aventura · Sunny Isles Beach · Surfside · Bal Harbour · Key Biscayne · Pinecrest · Palmetto Bay · Cutler Bay · South Miami · Miami Lakes · Miami Springs · Florida City · Kendall

Every type, every size, all of Miami-Dade

Tell us what is coming down. We will put a quote on it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single interior partition or a complete building gets the same thing: a written scope and a quote.

Call (305) 760-9827Request a quote